China Atmospheric Pressure Oil Hot Water Boiler Supplier

  • KCN Lê Minh Xuân - PTH BOILER

    Providing Boiler capacity of 18T/H for KUMHO Binh Duong PTH capacity of 18 tons/h fabricated and installed at Kumho Tire Binh Duong factory The capacity of 18 tons/h project for Kumho Binh Duong is the water pipe 4 passes Designed capacity of 18 tons steam/h fuel used by wood pellets 160-180kg/ of heat generated expected 4095kcal/kgGet Price

  • pressure - equipments- vietnam pressure - equipments

    * Providing full set of industrial boiler equipment * Designing and manufacturing boilers, pressure equipment * Repair, 213/3 Tan Phu 1 Street, Tan Binh Ward, Di An Province, Binh Duong, Vietnam +84 274 655 0268 + see more Business style: Send email Get Price

  • Phúc Trường Hải lắp đặt lò hơi cho Tôn Hoa Sen tại Bình Dương

    Tháng 7/2019, PTH Boiler đã bắt đầu tiến hành vận chuyển lắp đặt hệ thống lò hơi cho Công ty CP Tập đoàn Intimex với công suất 16 tấn/giờ. Chi tiết dự án Location: No. 3 VSIP II-A, Street 31, Vietnam - Singapore II-A Industrial Park, Vinh Tan Commune, Tan …Get Price

  • Hệ thống lò hơi trung tâm KCN Lê Minh Xuân - PTH BOILER

    Providing Thermal Oil Boiler capacity of 5.5 million Kcalo for An Cuong Wood Production Co., Ltd in Binh Duong province Chi tiết dự án Location Lot A17, Dat Cuoc Industrial Park - Zone B, Dat Cuoc Commune, Bac Tan Uyen District, Binh Duong ProvinceGet Price

  • Dự án lắp đặt lò hơi cho Công ty cổ phần Tập đoàn Intimex - PTH …

    In October 2017, PTH Boiler completed the installation of the central boiler system project to meet the saturated steam demand for industrial households in Le Minh Xuan Industrial Park – Ho Chi Minh City. The boiler project has a capacity of 15 tons of steam/hour, and in phase 1 supplies saturated steam for 10 customers. Get Price

  • Providing Boiler capacity of 18T/H for KUMHO Binh Duong. - PTH BOILER

    The boiler capacity of 18 tons/h project for Kumho Binh Duong is the boiler, water pipe, 4 passes. Designed capacity of 18 tons steam/h, fuel used by wood pellets 160-180kg/ton of heat generated expected 4095kcal/kg. With many years of experience in the field of manufacturing, PTH boiler has been gradually asserting a firm position in the Get Price

  • Providing Boiler capacity of 18T/H for KUMHO Binh Duong. - PTH …

    PTH Boiler capacity of 18 tons/h fabricated and installed at Kumho Tire Binh Duong factory. The boiler capacity of 18 tons/h project for Kumho Binh Duong is the boiler, water pipe, 4 passes. Designed capacity of 18 tons steam/h, fuel used by wood pellets 160-180kg/ton of heat generated expected 4095kcal/kg.Get Price

  • 1 ton oil fire boiler in Bien Hoa city

    Providing Boiler capacity of 4T/h for Ton Hoa Sen Company in Binh Duong province. Chi tiết dự án Location: Song Than 2 Industrial Park, Di An Town, Binh Duong province.Get Price

  • As of Sep, 2019

    Binh Duong There are many EPC & EPCM projects in many field (Amway, Dow Chemical, United Pharma, PVFCCo, (Boiler & Furnace) CAPACITY As above SCOPE EPC PROCESS LICENSOR N/A FEATURES N/A OTHER N/A 19 Oil & Gas CLIENT Get Price

  • Boiler With Working Capacity Of 4 Tons Hour

    Providing Boiler capacity of 18T/H for KUMHO Binh … PTH Boiler capacity of 18 tons/h fabricated and installed at Kumho Tire Binh Duong factory. The boiler capacity of 18 tons/h project for Kumho Binh Duong is the boiler, water pipe, 4 passes.Get Price

  • Ban Duy Pham - Chief Project & Mant Supervisor - Sing Industrial …

    Binh Duong, Vietnam - Coordinate with sale team for surveying gas supply system and gas requirement Control fabrication AG piping and critical pipeline connect boiler. Fabrication capacity of 51.257ID and Field capacity of 28.345ID with 160 worker (24 Get Price

  • EIMC Viet Nam - Posts | Facebook

    Location: Binh Duong Lease expiration date: 2057 Total area: 9 ha Built area: 1- Weaving factory: 21,100 m2 2- Garment factory: 31,500 m2 3- Office: 4,100 m2 4- Cafeteria: 630 m2 5- Pneumatic house: 1,060 m2 6- Boiler house: 4,000 m2 7- Warehouse: 1,500Get Price

  • DỰ ÁN - PTH BOILER

    PROJECT DETAILS Location: KUMHO- Binh Duong Company Investor: Kumho Tire Vietnam Scale: 18 tons of steam/hour Project: Supplying and installing one boiler 18T/h Expected Completion time: September 2020 Main contractor: PHUC TRUONG HAI BOILER CO., LTD Thermal Oil Boiler capacity of 4Million Kcal project for JOYFUL signed at the time of …Get Price

  • Providing Thermal Oil Boiler capacity of 4Million Kcal for JOYFUL - PTH BOILER

    Providing Boiler capacity of 6T/H for MNS Feed Nghe An Factory. PROJECT DETAILS: Providing Boiler capacity of 40T/H for Miza Thanh Hoa Paper. Providing Boiler capacity of 5T/h for Habeco Thai Binh Factory. Providing Boiler capacity of 18T/H for KUMHO Binh Duong. Providing Thermal Oil Boiler capacity of 4Million Kcal for JOYFUL.Get Price

  • Production Business - Power Generation Cooperation 3

    Service: Providing repair service for gas and steam turbine, generators, boilers and other services such as regular. repair and troubleshooting of equipment damages, electrical repair and ND & NDT testing. Location: 332 Doc Lap Street (National Highway 51), Phu My Town, Tan Thanh Dist., Ba Ria - Vung Tau.Get Price

Hot News

Hot News

Hot News